Eekels guarantees continuity during refurbishment works at the Schuddebeurs pumping station

Brabantse Delta, the local water board, is renovating the Schuddebeurs pumping station in Lage Zwaluwe. Eekels was called in to ensure continued pumping station operation during the refurbishment.

I16K-SS pumps

To ensure that the pumping station can remain in operation during the refurbishment work, which will take approximately 4 weeks, Eekels installed two I16K-SS pumps. Of all the pumps in our hire range, this pump has the greatest capacity, with a maximum capacity of more than 3,024 m³ per hour. The pumps are controlled by our PLC control container. The water is pumped upward via a Ø500 mm steel pipeline network and a pipe bridge to a higher point. The entire installation was assembled and operational within three days.